The installation involved removing the existing oil boiler and oil tank, upgrading the vented hot water system to a pressurized system, and relocating the hot water cylinder to a different part of the property. The customer’s primary goal was switching to a sustainable heating source.
We conducted a detailed survey, systematically measuring the dimensions of each room, window, and radiator while making informed assumptions about the building fabric where necessary. We also considered existing pipework routes and necessary modifications to meet the heating requirements. As this was a period property, particular attention was given to radiator sizing and location to preserve the property’s character. We discussed the impact of different design temperatures on radiator sizing with the customer, working through compromises and adjusting internal design temperatures to meet their needs while aligning as closely as possible with MCS guidelines. Once we finalized the radiator upgrades with the customer, radiators were carefully replaced to maintain the property’s aesthetics and space requirements, with additional radiators installed in areas that were underheated.
We worked together with the customer to position the external unit in a way that maintained both efficiency and aesthetic appeal. Additionally, we had to liaise with Historic England to obtain listed building consent, as the property is Grade II listed.
One of the main challenges was upgrading and installing the new pipework. We opted for copper piping throughout, as it would remain visible, allowing us to use smaller pipe diameters while maintaining the property’s character.
Another challenge was selecting the right air source heat pump, as the property had a high heat loss of 12.6 kW. We were keen to install a single unit rather than two in cascade to preserve the property’s appearance and minimize costs for the customer.
We’re delighted to report that our customer was very happy with the final system. Not only did he achieve his goal of moving away from fossil fuels, but his overall comfort also improved significantly. Previously, the customer had to use electric oil heaters throughout the property to supplement the oil boiler. He’s delighted that he no longer needs these, as we managed to solve this problem by reworking the radiator size and locations.
The house is now consistently warm, whereas before, it was only heated for around five hours a day. Additionally, we optimized the installation of new equipment so that the customer actually gained usable space throughout the property.


Water pressure has also improved, particularly for their showers—an upgrade the customer was very pleased with. They moved from a noisy pumped shower to a quiet, mains-pressure system. In fact, they reported back that they were able to run two baths and two showers in a single day with no drop in hot water temperature—something we were especially pleased to hear, as this exceeded what they were able to do with their previous system.
We work closely with our customers to ensure they are comfortable with their new system. We recognize that switching to a heat pump can be a significant adjustment, especially for those who have been using traditional heating systems for many years. As a result, we took the time to explain how to use the system.
Additionally, the system was installed with remote monitoring. This allows us to assist the customer quickly if they make setting adjustments they’re unsure about, ensuring they always get the best performance from their system.